0 hr sold / 0 hr spent across 0 of 60 eligible calls (0%). 0 confirmed + 0 recovered older jobs.
Report
Efficiency was calculated for 0 of 60 completed calls in this period: 0 confirmed and 0 recovered older jobs. Across those calls, 0 labor hours were sold and technicians spent 0 hours from On My Way through Finished. That equals 0% efficiency. For every 1.0 labor hour sold, approximately 0 hours were spent. Recovered older jobs are marked in Job by Job and stay out of technician rankings.
0 hr sold / 0 hr spent across 0 of 60 eligible calls (0%). 0 confirmed + 0 recovered older jobs.
0 labor hr / 0 hr spent across 0 confirmed calls.
No older jobs with enough recovered information are available in this period.
Measured calls where total call time was longer than the labor hours sold.
Not enough measured calls to compare.
Not enough measured calls to compare.
Not enough measured calls to compare.
Not enough measured calls to compare.
Compare labor time sold with the selected elapsed HCP time. Higher is better.
See how efficiency changes throughout the selected period.
No measured calls are available for this trend.
A detailed view of where measured calls fall, especially within the common under-80% range.
No measured calls are available for an efficiency outcome breakdown.
Measured calls using time from On My Way through Finished.
| No rows are available for this view. | ||||||
Only job types with at least one measured call are shown.
| No job types have measured calls for this period. | |||||
Crew jobs are shown separately because Housecall Pro gives the job one shared set of times. They never change the individual technician rankings above.